Analisis Pelaksanaan Perpanjang Hak Guna Bangunan (Studi Kasus Perkara Nomor 266/PDT.G/2018/PN.CBI)

Rizqi Fadillah, Rizqi Fadillah and S.D.W., Dodo and Mega Wijaya, Mustika (2020) Analisis Pelaksanaan Perpanjang Hak Guna Bangunan (Studi Kasus Perkara Nomor 266/PDT.G/2018/PN.CBI). Skripsi thesis, Universitas Pakuan.

[img] Text
Cover.pdf

Download (360kB)
[img] Text
Lembar Pengesahan.pdf

Download (541kB)

Abstract

The period for granting the right to build is regulated in article 25 to article 29 of Government Regulation no. 40 of 1996 regulates the period of granting Building Use Rights. Article 25 Government Regulation No. 40/1996 The right to be referred to in article 22 is granted for a maximum period of thirty years and can be extended for a maximum period of twenty years. After the term of the Building Use Rights and its extension as referred to in paragraph (1) ends, former rights holders can be granted renewals of the Building Use Rights on the same land. Article 27 Application for extension of the Building Use Right period, Application for extension of the Building Use Right period or renewal thereof is submitted no later than 2 (two) years prior to the expiration of said Building Use Right period or its extension. How is the implementation of extension of Building Use Rights that have expired. What are the legal consequences for the implementation of extension of Building Use Rights that have expired. This research method uses the research used is normative research which is supported by empirical research that is research used in this writing is descriptive analytical. Extension of a building use right that has passed is an increase in the period of validity of a land title without changing the conditions for granting said right, the application of which can be submitted before the validity period of the land rights in question ends. Due to the legal consequence of the implementation of the extension of the SHGB which has ended the validity period of the civil rights is still attached to the owner of the shgb so that there are priority rights, therefore the hgb that has passed the period cannot extend the right to use the building but can do so by applying for renewal of use rights buildings that are over their term. For the Government, in this case the Bogor Regency Land Agency, it would be good to socialize before giving Building Use Rights to those who will be given Building Use Rights that the Building Use Rights have a period of time. This needs to be done in anticipation of negligence in extending and renewing the right to use the building. Keywords: Implementation, Extension, Building Use Rights

Item Type: Thesis (Skripsi)
Subjects: Fakultas Hukum > Hukum Perdata > HGB (Hak Guna Bangunan)
Divisions: Fakultas Hukum > Ilmu Hukum
Depositing User: PERPUSTAKAAN FAKULTAS HUKUM UNPAK
Date Deposited: 29 Aug 2022 14:28
Last Modified: 29 Aug 2022 14:28
URI: http://eprints.unpak.ac.id/id/eprint/2466

Actions (login required)

View Item View Item