eprintid: 9711 rev_number: 6 eprint_status: archive userid: 3157 dir: disk0/00/00/97/11 datestamp: 2025-06-23 04:02:27 lastmod: 2025-06-23 04:02:27 status_changed: 2025-06-23 04:02:27 type: thesis metadata_visibility: show creators_name: Muhyiddin, Muhammad Azhariansyah creators_NPM: 053115020 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS corp_creators: Universitas Pakuan corp_creators: Fakultas Teknik corp_creators: Teknik Sipil title: Analisis percepatan pelaksanaan konstruksi dengan metode time cost trade off pada gedung bertingkat(studi kasus:pembangunan rumah sakit islam aysha) ispublished: pub subjects: SB divisions: Pro_ts full_text_status: none date: 2022-11-19 date_type: published institution: Universitas Pakuan department: Teknik Sipil thesis_type: Tugas_Akhir thesis_name: Sarjana citation: Muhyiddin, Muhammad Azhariansyah (2022) Analisis percepatan pelaksanaan konstruksi dengan metode time cost trade off pada gedung bertingkat(studi kasus:pembangunan rumah sakit islam aysha). Tugas Akhir thesis, Universitas Pakuan.